Preheating Protocols for Heavy-Duty Shear Blades
Jul 20, 2026

For integrated CNC shear blades exceeding 3 meters in length, high alloy steels such as Cr12MoV, DC53, LD, and H13K are typically utilized. Because these blades demand exceptional precision in parallelism, perpendicularity, hole pitch tolerances, and hardness uniformity, the margin for heat-treatment distortion is incredibly slim.

To mitigate this, a two-stage preheating process is standard during the heating, soaking, and quenching cycles:

  • Stage 1: Isothermal holding at 500°C.

  • Stage 2: Temperature ramp-up to 850°C for the second preheat.

During the heating cycle, the material undergoes thermal expansion, by volumetric contraction upon reaching the phase transition point. Implementing a strict preheating regimen is therefore paramount to minimizing distortion, particularly in extra-long, single-piece blades.

Bülten

Okuyun, yayınlanmıştır, abone olun lütfen kal ve ne düşündüğünüzü bize anlatmak için geldiniz.

Bir mesaj bırakın
Hoşgeldiniz Licheng
Eğer ürünlerimiz ile ilgileniyorsanız ve daha fazla ayrıntı bilmek istiyorsanız,mesaj bırakın lütfen,biz en kısa sürede biz size cevap verecektir.

Ana sayfa

Ürünler

hakkında

iletişim